Home / Roof & Wall Systems / Flat & low-slope roofs
Flat roof restoration · Liquid-applied membrane

Restore the membrane. Skip the tear‑off.

Single-ply, mod-bit, built-up and spray foam roofs restored in place. The existing roof is renewed with one seamless, liquid-applied membrane: AcryLinkG where the roof drains, SubSlope silicone where it ponds.

TPOPVCEPDMMod-bitBuilt-upSpray foam
The flat roof systemBuild-up, top to bottom
  1. Top coat
    AcryLinkG acrylic or SubSlope silicone
  2. Base coat
    Builds the membrane thickness
  3. Seams, flashings, drains
    Reinforced where they are failing
  4. Primer, by substrate
    IsoTack on TPO · AcryBlock on asphalt
  5. Existing roof
    Cleaned; IsoClean on EPDM; wet areas replaced
10–20 yr
System warranty, longer terms available
Since 1981
Formulated and made in Pearland, TX
No tear-off
No interruption to operations
FM · UL 790
Tested and listed systems
Why flat roofs fail

Seams, flashings, an aging membrane and standing water.

Flat roofs leak at the seams and flashings first, and every membrane ages its own way. The repair starts with what the roof actually needs, not a blanket spec.

Seams and flashings

Laps, curbs, drains and flashings move with every temperature swing. That is where a flat roof leaks first.

The fix: reinforce only what is failing, with AcrySeam or with AcryCaulk and fabric. Sound seams are left alone.
An aging membrane

TPO and PVC weather until the scrim shows through. Mod-bit loses its granules, the exposed asphalt bleeds out and alligators, and those cracks turn into leaks, worst at over-mopped seams and weak points.

The fix: clean it, prime it for the substrate and cover it with one cross-linked membrane that stops the aging where it is.
Ponding water

Water still standing 24 hours after a rain ages the roof fastest and finds every weak spot.

The fix: some ponding gets a hybrid system: AcryLinkG on the field, SubSlope silicone in the low areas. When a high percentage of the roof ponds, IPC proposes a full SubSlope system.
Two chemistries, one recommendation

Acrylic or silicone is decided on the roof.

Drainage decides the chemistry. Your IPC technical rep makes the call after the assessment, and both go through the same IPC inspection and warranty process.

Acrylic
AcryLinkG

For roofs with positive drainage. Cross-linked acrylic with high reflectivity, in white and standard colors.

  • Single-ply, mod-bit, BUR and spray foam
  • Highest reflectivity for cooling savings
  • Pairs with SubSlope in low areas for a hybrid system
Silicone
SubSlope

For roofs and areas that pond. Silicone holds up to standing water where drainage can’t be corrected.

  • Low areas in a hybrid system, or the whole roof when ponding is widespread
  • Applied over the same detail work
  • Same IPC inspection and warranty process
How the job runs

Six steps, inspected by IPC.

IPC technical support runs from the first assessment to the final inspection, on site or by phone and video as the project needs. The system warranty is issued only after the roof passes IPC’s final inspection.

1
Assess

The contractor, IPC, or both together: core cuts and an infrared survey find wet insulation, which is cut out and replaced. Ponding is checked 24 hours after a rain.

2
Clean the membrane

Power wash the whole roof. EPDM is cleaned with IsoClean.

3
Prime by substrate

IsoTack on TPO. PVC takes AcryLinkG with no primer; silicone over PVC is primed first. AcryBlock on mod-bit and built-up roofs where asphalt can bleed through.

4
Reinforce what is failing

Failing seams, flashings, curbs, drains and penetrations get AcrySeam, or AcryCaulk and fabric. Sound seams are left as they are.

5
Apply the membrane

AcryLinkG, SubSlope, or a hybrid with SubSlope in the low areas, installed to the warranty requirements with wet-mil checks as the crew goes.

6
Inspect & warrant

IPC final inspection, then the system warranty is issued to the owner.

Coverage & warranty

The substrate and the term set the rate.

Total coating applied per 100 sq ft. Your project specification confirms the final rates.

System warranty
AcryLinkG
single-ply
AcryLinkG
mod-bit & BUR
SubSlope
silicone
10 years
2 gal / sq
3 gal / sq
1.5 gal / sq
15 years
3 gal / sq
4 gal / sq
2 gal / sq
20 years
4 gal / sq
5 gal / sq
2.5 gal / sq

Longer terms available. Warranties require an IPC approved applicator and an IPC final inspection. Open the coverage calculator →

Why it lasts

Cross-linked, then reinforced.

AcryLinkG cross-links into one continuous membrane that stretches with the roof, and every seam underneath is reinforced before it goes on.

360%
Elongation, ASTM D412
−45°F
to 250°F service range
2 in.
Hail covered by warranty
Water-based
Low odor over occupied buildings
IPC roof detail drawing: Failed seam repair
Detail 04Failed seam repairSubSlope mod-bit specification
IPC roof detail drawing: Field drain
Detail 05Field drainSubSlope mod-bit specification
IPC roof detail drawing: Pitch pocket
Detail 15Pitch pocketSubSlope mod-bit specification
IPC roof detail drawing: Counter flashing
Detail 13Counter flashingSubSlope mod-bit specification
IPC roof detail drawing: Cant with counter flashing
AcryLinkGCant with counter flashingAcryLinkG specification
IPC roof detail drawing: Coping cap
Detail 21Coping capSubSlope mod-bit specification
IPC roof detail drawing: Expansion joint
Detail 01Expansion jointSubSlope mod-bit specification
IPC roof detail drawing: Parapet wall with metal cap
AcryLinkGParapet wall with metal capAcryLinkG specification
IPC detail drawings
Flat roofs we’ve restored

Membranes restored in place, in every sector.

Honeywell roofEPDM
Honeywell
Industrial / Manufacturing
600,000 SF
OQ Chemicals roofMod-bit hybridBefore
OQ Chemicals
Chemical lab
16,000 SF
TPO▶ Hover for drone
Hotel Galvez
Hospitality
34,000 SF
Flat roof questions

Straight answers from the manufacturer.

Have a roof in mind? Send photos and our technical department will tell you if it’s a candidate.

Can a single-ply roof be coated?

Yes. TPO, PVC and EPDM roofs that are still attached and dry underneath are restored in place, even once the scrim starts to show. EPDM is cleaned with IsoClean, TPO is primed with IsoTack, and PVC takes AcryLinkG with no primer (silicone over PVC is primed first). A technical review confirms the roof qualifies.

Acrylic or silicone: which one goes on my roof?

Drainage decides. AcryLinkG goes on roofs that drain. If water is still standing 24 hours after a rain, those low areas get SubSlope silicone in a hybrid system. When a high percentage of the roof ponds, IPC proposes a full SubSlope system.

What if the roof has wet insulation?

Wet areas are found with core cuts and an infrared survey, cut out and replaced before anything is coated. Coating over wet insulation is never part of an IPC system.

Will asphalt bleed through on a mod-bit or built-up roof?

Not with the right primer. AcryBlock is applied first on asphalt surfaces to stop bleed-through before the membrane goes on.

Can the building stay in operation?

Yes. Nothing is torn off, and AcryLinkG is water-based and low-odor, so crews work over occupied hospitals, hotels and plants without shutting them down.

What warranty comes with a flat roof restoration?

System warranties run 10, 15 or 20 years, with longer terms available, when an IPC approved applicator installs the system and IPC inspects it.

Free technical review

Is your flat roof a restoration candidate?

Send photos, a core cut or an infrared scan. An IPC technical rep reviews it and comes back with a recommendation and a written specification, at no cost.